
Technical Review by Toronto Water staff – Application to Toronto Water for request to encroach within a City permanent or temporary easement (related to City water and sewer infrastructure) $354.29 minimum fee additional $87.39/hr for each hour after 4 hrs to a maximum of $1,772.61 Technical Review by Toronto Water staff – Application to Toronto Water for new connection or change or alteration to the existing storm connection, sanitary or water supply connection Technical Review by Toronto Water staff – Application to Toronto Water for exemption to permit the construction of a driveway sloped downwards towards a residential building Inspection fee for the reuse of residential City sewer connection up to 150 mm in diameter To disconnect residential sanitary sewer service connection in road allowance
#Water cad pricing install
To install new residential storm sewer service connection in road allowance To install new residential sanitary sewer service connection in road allowance


Water Supply Back-flow Prevention Device Testing Reports Unregistered water each day order not compliedĪnnual Seasonal Meter Activation Fee: includes replacement, removal of water meter one turn-on, one turn-off Single Service call Turn-off/Turn-on within 30 minutes Water Turn-off Fee for demolition (disconnection of old water service not included) Water meter accuracy test meter less than or equal to 50 mm – No Chamber – applied if meter does not over-register Reuse of residential water service 19 mm to 25 mm Installing 25 mm new residential water service and meterĭisconnection Fee for any residential water service less than or equal to 25 mm Installing 19 mm new residential water service and meter If additional notification is required, fees will be charged on the condo utility account for each notice mailed to every individual condominium unit owner in the building/complex.įees are reviewed annually as part of the budget process and are subject to change. A single charge for the first notification sent to the Condo/Management Board. Outstanding Utility Fees/Charges for Condo/Management Boards – Applied to a condominium utility account for all mailed overdue notifications. Ownership Change Fee – Request to change ownership on both tax and utility accounts for the same property when requested at the same time Utility Account Ownership Change Fee – Administrative fee to reflect a change in ownership on an existing utility account Water Consumption Statement – Statement detailing activity on a utility account for each subsequent year Water Consumption Statement – Statement detailing activity on a utility account for one specified year

Utility Clearance Certificate – Notice confirming balance owing on a utility account, generally used for property sale transactions Special/Final Read Fee – To finalize a utility accountĭishonoured Cheque Processing – Processing a cheque returned by a bank or financial institution for reasons, such as insufficient funds A copy of the bill will be mailed to the property owner. New Account Setup Fee – For water/utility accountsĭuplicate Utility Bill Fee – Applied to a utility account when a Utility Bill Designate agreement is in place.

Payment Re-Distribution Fee – Any request to re-distribute payment when an electronic payment has been made to an incorrect account Reprint Utility Bill – For a request for the reproduction/reprint of a bill
